Dovico Feedback

Enter your idea to see if it has already been submitted. If it hasn’t, then click on ‘Create New Idea’ and submit your idea using a single vote or more depending on how much weight you decide.

Dovico Feedback

Categories

JUMP TO ANOTHER FORUM

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Before the changes employee calendar was more convenient.

    Before, when we were in specific date page, there was more information about the date (project, job ID, overtime rate and so on).

    Now we see only the list and when I want to change for e.g. overtime rate I need to click "edit" and new window opens.

    It would be much more easier as was before: on the specific date page to show all related info and make changes on the same page.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  2. It would be great if there was a way to enter project settings from the project summary page.

    Currently there is no option to navigate to the Project Settings directly from the Project Summary. Instead I have to exit the Project Summary page and click on the Edit button next to my project in the list to enter the Project Settings page.

    Makes for some unnecessary going back and forth between the project summary and its settings.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  3. Currently, it's only possible to set a project alert against the total hours or % of the project, but it would be more useful if I could set an alert against a task.

    My use case:
    Our team often overruns heavily on one task, but will spend less time than estimated on another. When I set a project alert based on hours/% spent against the entire project I don't catch the task that is overrunning until it has overrun so much that it's using up almost all estimated project hours (across all tasks).

    This means that after the overrunning task…

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  4. Ability to add budget to a project (not to the person / task).
    Use Case: We have POs for the year tied to a project, the tasks under them are used to report on the type of activities being done, but all fall against the one budget. Each task is not budget driven, but the overall project is. This will also give the ability to look at current (past) project billing, budget and forecast a run rate (when the PO will deplete) for future weeks / month at a project level.

    Enough of a requirement to have us consider /…

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    planned  ·  1 comment  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  5. Add an option to show the critical path (longest path of activities which are the shortest time to finish the project), like MS Project.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  6. Projects that span several years may have different billing rates per period of time. Having the ability to set rates based on a specific time period would be useful. And to be able to do this in one window, one time, when you initially set up the task for that employee and/or edit capabilities should this information become known only after the project has been setup.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  7. If we enter a rate incorrectly, only the time after the correction calculates using the new rate, so it's impossible to obtain an accurate project costing report.

    Adding a check box asking if the rate should be applied back to [pick a date] would rectify this problem.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  8. When an employee already exists in Timesheet and they are added to a MS Project task and the project is synchronized with Timesheet, their name is duplicated in the Timesheet employee list and that MS Project task does not show up on the employee timesheet.
    It would be great to allow the Timesheet administrator to "merge" or sync the names together so it is recognized as the same person.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  9. As I review timesheets, i look at the description on each entry. Two-thirds of the screen is blank, which forces me to drag down the dividing bar between the timesheet and the description for the entry. It's ok if the page doesn't remember where i left the dividing bar the last time i did approvals, but it should be much lower so i can see more of the timesheet. It is not unusual for me to review 20+rows of timesheet data, and when i click on each cell to view the description contents, i run into this problem.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  10. When creating a new notification, allow to select teams as recipient instead of having to select each employee and add them to the list.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  11. add feature to collapse and expand "client" in quick assign similar to the "List by client" check box in the project list filter in reports (edit section)

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  12. Allow Microsoft's ADFS solution to proxy the LDAP call to active directory for user authentication when using the hosted Dovico Timesheet solution.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  13. Would like to have a security group that allows full functionality of the administrator except ability to see rates

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  14. I think it would be helfpul if all time showed in the Time Calendar, broken down by type (entered, submitted, rejected, approved) and with a Grand Total. When I am looking at when people missed time it is hard to tell if they didn't enter the time or simply didn't submit it. Being able to see all these in the Tiem Calendar would address this.

    15 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  15. We have been challenged with time being moved and negatively impacting reports on the project dollars after the invoice was completed. As part of the invoicing cycle, the time in the DB should be locked out so it can no longer be moved or adjusted. This issue has created some major headaches internally. A system similar to the employee timelockout could be established based on invoices

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →

    Dec 6 2013 – Modified status for further product management investigation.

    Dec 6 2013 – Discussed with Dovico support department, so marking this suggestion as completed. Please advise if this suggestion is still applicable to you and I will change status accordingly.

    Dec 6 2013 – Updated status to Under Review as per discussion with Randy.

  16. For instance, when vacation is added into the Planning Module, all projects that the employee is working on need to be leveled to reflect the new availability. If that employee is working on numerous projects it becomes cumbersome to level, save and publish each and every one each time.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  17. As as system administrator for Dovico, it will be very handy and to have the option to select multiple users where you can show /hide assignment at the same time.

    The main use of this is say for example there is a change on task assignment for a certain department on specific time frame so it is very hard to do manually hiding assignments at employee level if you have 40 employees

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  18. Project Planning - Ability to assign Project Management Hours that encompass the length of the entire project after balancing by week of the project. Currently the hours either are dumped at the beginning of the project, or when linked to tasks do not provide time slots for each week a project is worked on.

    20 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  3 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  19. Create a feature when I associate one user in Project add automatic in workflow.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
  20. Is it possible to have all users leave reflected in a different colour in the calendar format in one view?

    11 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  0 comments  ·  Management Features  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1 3 4 5
  • Don't see your idea?